A frameless install typically starts with marking and fixing the concealed rail level and true, then lifting the panel into place, a two person job for anything above a modest size, given there’s no frame edge to grip during positioning. Getting this step right is what keeps the board sitting flush and level for years afterwards, and rushing the levelling step to save time on the day is a false economy that shows up clearly once the board is finished and lit. On a live fit out, the install usually needs to happen after painting and flooring but before final snagging, since the rail fixing can mark a finished wall if done too early or too late in the programme, so flagging this sequencing to your main contractor avoids a rework visit. Most single panel installations are a two to three hour visit, but if other trades such as electricians or flooring contractors are still working in the space, that visit may need rescheduling around them. For an occupied office, ask your supplier whether the install can run outside core hours so the room stays usable in the meantime, and confirm access hours with building management ahead of time to avoid an awkward conversation with security on the day.