Should a site survey always be included in a frameless whiteboard quote?
It should at least be offered, given how much the finished result depends on wall condition. Skipping it entirely increases the risk of an unplanned cost later.
Why does frameless installation cost more than framed installation?
It requires tighter tolerances and more careful setting-out, which takes more time and skill than fitting a standard framed board.
What happens if wall correction is needed after the quote is accepted?
A well-structured quote should have already flagged this possibility based on the survey, with correction costs itemised rather than added as a surprise.
Can I compare frameless quotes fairly if they're structured differently?
Only partially. Asking each supplier to itemise the same categories, board, survey, preparation and installation, makes a fair comparison far easier.