How is a bespoke wall project different from ordering a standard board?
It involves survey, design sign-off, coordinated production and staged installation, closer to a small construction project than a catalogue order.
What happens during the initial survey stage?
An accurate measurement of the wall is taken along with a discussion of intended use, which shapes the size and configuration of the finished wall.
Why does design need sign-off before production starts?
Changes become considerably more disruptive once manufacturing has begun, so confirming the design early avoids costly rework.
Can a bespoke wall be installed in stages?
Yes, particularly on larger projects, where delivery and installation are often sequenced to minimise disruption to the space.
What happens at the end of a bespoke wall project?
A final check against the original signed-off specification confirms the finished wall matches what was agreed before the project closes out.