Run kanban, sprint planning or status tracking on a small magnetic board, and the method itself gets constrained by how much surface is actually available for it. Some planning methods need a full magnetic wall to work as intended, not a fraction of one. Recognise which methods a team actually uses and size the board for the method, not the other way around.
